Case Studies

We pride ourselves on meeting, and exceeding, the aspirations of our clients, whether they be owners, investors, occupiers, developers or managers of buildings.

Search case studies


Case Studies

26 case studies found. Viewing page 1 of 3

Gibson House

Gibson House was constructed in 1906, originally to house widows and orphans of merchant seamen. The five storey property had been vacant for seven years. Historic fire damage, pigeon infestation, disturbed asbestos and significant water ingress following

Queensgate Shopping Centre PPM

Watts was asked to produce a Planned Preventative Maintenance schedule for The Queensgate Shopping Centre, Peterborough. This regional shopping centre provides over 1 million square feet of net lettable space and car parking provisions for 2,200 cars. We

Bullring Shopping Centre

Watts was asked to produce a Planned Preventative Maintenance schedule for Bullring Shopping Centre in the heart of Birmingham. With over 1.2 million square feet, The Bullring is the 12th largest shopping centre in the UK. A team five Watts building surve

Highcross Shopping Centre

Watts was instructed to inspect the Highcross Shopping Centre to produce a 20-year Planned Preventative Maintenance Programme. Highcross is a city centre shopping mall comprising different elements and types of construction. The original shopping centre w

Cromer Road, Weighbridge Site

Our surveyor undertook full planned maintenance for our long standing Client. The works involved a full condition survey in effect of the client's protfolio and assets for the purpose of sale, insurance or maintenance. A Phase I environmental assessment

Building Condition Survey

Watts was instructed by Queen's University Belfast to undertake the survey of 253 buildings with a gross floor area of approximately 292,000 square metres. The vast majority of the buildings are situated within a fairly confined geographical area in sout

Town Hall Complex

Watts carried out a feasibility study for the replacement and upgrade of all mechanical and electrical services to the entire Town Hall Complex. Watts acted as lead consultant, coordinating specialist services, including sustainability consultants, as wel

Brent Roof Surveys

Watts was commissioned to carry out planned preventative maintenance / roof condition surveys of the entire portfolio of Brent's primary schools to support their capital works programme. The surveys were turned around within a month to achieve the clientâ

Town Hall Extension

The building was designed by the Camden Architects Department, and built between 1973 and 1977. The facia of the building is clad with concrete panels that had become heavily pollution-stained since the building was constructed. The objective of this fast

Old Town Hall

Watts provided a feasibility and architectural concept design for a new one-stop multi-access point. Watts acted as lead consultant, coordinating architectural, mechanical and electrical services and structural engineering consultants, as well as providin