Case Studies

We pride ourselves on meeting, and exceeding, the aspirations of our clients, whether they be owners, investors, occupiers, developers or managers of buildings.

Search case studies


Case Studies

26 case studies found. Viewing page 2 of 3

Town Hall Complex

Watts carried out a feasibility study for the replacement and upgrade of all mechanical and electrical services to the entire Town Hall Complex. Watts acted as lead consultant, coordinating specialist services, including sustainability consultants, as wel

Building Condition Survey

Watts was instructed by Queen's University Belfast to undertake the survey of 253 buildings with a gross floor area of approximately 292,000 square metres. The vast majority of the buildings are situated within a fairly confined geographical area in sout

120 Planned Maintenance Reports

All Councils are responsible for a large portfolio of buildings and a variety of different types of property. The Council that approached Watts recognised the need to review, plan and budget for upcoming maintenance to these properties over the next ten y

Kensington & Chelsea Town Hall

Watts carried out a detailed Planned Preventative Maintnenance (PPM) survey of The Town Hall Complex split over two sites. The Kensington site comprises a 40,000 m² purpose built 1980's complex and the Chelsea site a fine Neoclassical Grade II Listed bui

Brent PPM and Capital Repairs

Watts carried out Planned Preventative Maintenance (PPM) surveys of over 100 Brent Corporate properties ranging from the main Art Deco Town Hall Building through to smaller sundry buildings in parks. The surveys were carried out over the course of 12 mont

New Campus Glasgow

New Campus Glasgow comprises the amalgamation of three main colleges in Glasgow: the Glasgow College of Nautical Studies, Central College and Glasgow Metropolitan College. Between the three colleges, they amass over 12 buildings within Glasgow City Centre

Repton School

Repton School was founded in 1557 and comprises 107 buildings, eight Listed Grade I, 12 listed Grade II and 74 in a designated conservation area. Watts was appointed to survey all 107 buildings and provide a report on the overall internal and external con

Topographic Surveys

Watts held a two year framework agreement with the Department of Rural Development, Roads Service to execute topographic surveys. These surveys were required to provide accurate dimensional and narrative information to support the re-design and improvemen

Northern Ireland Ambulance Service

Watts recently completed surveys of 49 ambulance stations. Surveys commenced within one week of instruction and the field survey work was largely completed within a three week period. This necessitated a concentrated planning period with swift confirmatio

Intrusive Building Surveys

Watts was appointed to provide intrusive building condition survey services to the Strathclyde Partnership for Transport Subway. The scope of work included fourteen operational subway stations, a large stores facility and the main SPT Subway Depot on the

Contact your local Watts office