Case Studies

We pride ourselves on meeting, and exceeding, the aspirations of our clients, whether they be owners, investors, occupiers, developers or managers of buildings.

Search case studies


Case Studies

26 case studies found. Viewing page 3 of 3

SPT Condition Surveys

The purpose of the project was to agree access and carry out condition surveys for over 200 operational police properties throughout west central Scotland. The key requirements were to identify and prioritise any repair or maintenance works required to th

SFC Condition Surveys

Watts was commissioned to survey and report on 39 further education colleges throughout Scotland. The purpose of the commission was to provide the client with specific information on each college campus to allow equitable assessment of future funding appl

The Royal Albert Hall

The Grade 1 listed Royal Albert Hall is one of the country’s most treasured and iconic buildings. It was opened in 1871 by Queen Victoria . Watts was commissioned to produce a detailed Building Reinstatement Valuation. Due to our detailed Historic element

Bolton Schools Condition Surveys

Following a competitive tender, Watts was instructed by Bolton MBC to undertake condition reports for 19 secondary schools being considered for inclusion within wave 7 & 8 of the Building Schools for the Future (BSF) programme. The reports informed Bolto

Liverpool Schools Condition Surveys

Watts was instructed by Liverpool City Council to undertake condition reports for four secondary schools being considered for inclusion within the Building Schools for the Future (BSF) programme. The reports informed the City Council and the PFI bidders a

Lambeth Major Repairs Programme

Watts was appointed by the client as interim principal consultant to assist in the delivery of a major repairs allocation programme. The client was undertaking an organisational restructure to provide a more efficient service that achieved the targets of

Contact your local Watts office