83 case studies found. Viewing page 3 of 9

Brent Roof Surveys

Watts was commissioned to carry out planned preventative maintenance / roof condition surveys of the entire portfolio of Brent's primary schools to support their capital works programme. The surveys were turned around within a month to achieve the clientâ

Town Hall Complex

Watts carried out a feasibility study for the replacement and upgrade of all mechanical and electrical services to the entire Town Hall Complex. Watts acted as lead consultant, coordinating specialist services, including sustainability consultants, as wel

Building Condition Survey

Watts was instructed by Queen's University Belfast to undertake the survey of 253 buildings with a gross floor area of approximately 292,000 square metres. The vast majority of the buildings are situated within a fairly confined geographical area in sout

120 Planned Maintenance Reports

All Councils are responsible for a large portfolio of buildings and a variety of different types of property. The Council that approached Watts recognised the need to review, plan and budget for upcoming maintenance to these properties over the next ten y

Kensington & Chelsea Town Hall

Watts carried out a detailed Planned Preventative Maintnenance (PPM) survey of The Town Hall Complex split over two sites. The Kensington site comprises a 40,000 m² purpose built 1980's complex and the Chelsea site a fine Neoclassical Grade II Listed bui

Brent PPM and Capital Repairs

Watts carried out Planned Preventative Maintenance (PPM) surveys of over 100 Brent Corporate properties ranging from the main Art Deco Town Hall Building through to smaller sundry buildings in parks. The surveys were carried out over the course of 12 mont

Walsall Consultancy Framework

Watts was appointed to the Walsall Council Framework in January 2009 to provide quantity surveying and project management services across various schemes. These projects range in cost and complexity for the duration of the framework.

Lincoln - Contractor OJEU Review

Watts undertook a review of contractors' PQQ submissions relating to a new development. The process involved agreeing scoring criteria, establishing a scoring matrix and preparing a final recommendation of companies to short list for tender.

Dolphin Square

Watts was instructed to carry out an overview access audit of Dolphin Square, which comprises mixed-use accommodation. The facilities included: four-star hotel accommodation, with dining areas and bars; leisure facilities; a shopping arcade; residential a

Royal Ballet School

The Royal Ballet School is a group of Grade I listed buildings dating from 1726 to 1990. The centrepiece is the Kings Pavilion constructed between 1726-1728 as a Royal hunting lodge. The crescent wings were added in 1801-1816 and it remained a royal resid