Bolton Schools Condition Surveys
Client: Bolton MBC
Office: Manchester
Following a competitive tender, Watts was instructed by Bolton MBC to undertake condition reports for 19 secondary schools being considered for inclusion within wave 7 & 8 of the Building Schools for the Future (BSF) programme. The reports informed Bolton MBC as to the current condition of the schools and assisted the decision making process on the extent and type of works required to each school.